General information on use and management of infrastructure and services

Measure 3.p and 3.q – the number of electric charging and refueling points present for each managed highway section and per direction of travel, broken down by fuel type

There are 5 electric charging stations on the highway and of these 4 are located in the A25 Service Areas Montevelino North and South , Brecciarola North and South (2 for each direction) and are slow charging with rated power < 20kw, equipped with 1 column per area with 2 charging points , while on the A24 at the Tiburtina Sud service station at km 5.600 direction GRA, there is a station equipped with 3 charging columns with six ultra fast charging points with rated power 150 kw< P < 300 kw. At the following link www.stradadeiparchi.it/en/highways/service-and-rest-areas of the Strada dei Parchi website, it is possible to consult all the detailed information about the services present in the Service Areas with specific reference to the number of refueling points present.
In the table that can be downloaded at this link (PDF file), it is possible to view the services available by individual area.

Back to News
The Web TV of Strada dei Parchi

Recent news

SAFETY

Don’t let the beauty around you go up in smoke

Every trip along the A24 and A25 highways takes travelers through one of Italy’s most precious natural treasures. Forests, valleys, mountains, protected areas, and habitats that are home to an...

TOURISM

From the highways to the sea: a guide to award-winning beaches and lakes

In 2026, Abruzzo once again ranks among the Italian regions with the cleanest beaches and highest-quality services: 16 Blue Flags were awarded—the same number as the previous year—demonstrating a...

TRADITIONS

Banderesi colors arrive in Bucchianico

Back in Bucchianico, a small town in the province of Chieti, is the centuries-old festival of the Banderesi, in honor of St. Urban. The 2026 edition will take place between May 17 and 25, with the...