I, the undersigned Geom. Igino Lai, Operations Director of the Concessionaire Strada dei Parchi SpA (SdP)
WHEREAS
- That it is necessary to carry out investigation and survey activities by the Structure of the Extraordinary Commissioner for the earthquake-proof adaptation and safety of the A24 and A25 freeways from km 98+500 to km 100+300 of the A25 Torano – Pescara freeway;
- that, in connection with the evaluations carried out to balance the operational needs of the construction sites with the fluidity of highway traffic, the competent Coordinator of the 3rd Highway Safety Center of the Operations Department pointed out the need, in order to ensure the safety of highway users and the personnel assigned to the execution of the works, to provide for the necessary partializations of the highway roadways;
VIEWED
- Articles 5 – 6 paragraph 4 and 6 – 21 – 39 and 41 of the New Highway Code;
- Articles 77 and 81 of the Regulations for Execution and Implementation of the New Highway Code;
- Ministerial Decree 10/07/2002 “Technical Specification of Temporary Signaling Schemes”;
- the Decree 22.01.2019 “Identification of the procedure for reviewing, supplementing and affixing road signs intended for work activities that take place in the presence of vehicular traffic“
- Ordinance 22bis/2022E dated 10.05.2022
ORDER
from 10.01.2024 to 11.01.2024 the implementation of the following measure:
- Partialization of the eastbound carriageway lane (via dx) between progressions km 98+500 c.ca and km 100+300 c.ca of the A25 freeway (Table 16 of DM 10.07.2002 – “lane closure on two-lane carriageway”).
This Ordinance is made known to the public with the installation of the prescribed signs in accordance with the N.C.d.S. D.Lgs.n. 285 of 30/04/1992 and the Implementing Regulations set forth in D.P.R. 16/12/1992 n. 495 as amended and the Ministerial Decree of Infrastructure and Transport of July 10, 2002 as well as the relevant explanatory circulars on the subject.
The signaling devices adopted for the temporary signaling of the aforementioned detours must be affixed and constantly maintained by the TOTO Costruzioni Generali SpA Company, appointed by the Extraordinary Commissioner’s Structure, which remains solely responsible, both civilly and criminally, for any damage caused to third parties and property in dependence of defects or inefficiency of the signage, relieving the Strada dei Parchi SpA Concessionaire from any claims or harassment, including judicial.
The Exercise Director
(Igino Lai)