A25, San Domenico tunnel: high technology for tunnel inspection

Work has been going on inside the San Domenico tunnel on the A25 for about a month.
Tunnels on the A24 and A25 have always been checked twice a year. Meter by meter. A visual check done by specialized personnel. On a quarterly basis. And then once a year, the analysis is carried out more thoroughly.
But why was it necessary to close one of the longest tunnels on our entire highway network for such a long time this time?
The new method adopted by the Ministry of Infrastructure and Transport is called the “Tunnel Inspection Manual.” And it sets new parameters with which to carry out inspections inside highway tunnels.

In this video we show you how inspections were carried out inside the large tunnel that connects the Peligna Valley to Marsica.

The Web TV of Strada dei Parchi

Web TV

Lavori e Sicurezza

Fire in a Tunnel: When Every Minute Counts

What happens behind the scenes when a fire breaks out inside a highway tunnel? In this video, we take a closer look at a complex emergency drill conducted in the Roviano Tunnel on the A24 highway,...

Recent news

YOUR CAR

Winter endowments from November 15: everything you need to know

With the gradual drop in temperatures and the imminent arrival of winter, the obligation to travel on roads equipped with winter tires or snow chains is triggered throughout Italy. These devices...

EVENTS

L’Aquila, a November Full of Culture: The Municipal Theater Reopens

With the return of the “Nazzareno De Angelis” to the restored halls of Palazzo Farinosi Branconi, exhibitions, art, and walks mark the fall in the Italian Capital of Culture Seventeen years after...