A24 Fornaca Viaduct: reconstruction begins

Six months after beingdemolished with micro-explosive charges, the new corten steel decks of the Fornaca viaduct, in the direction of L’Aquila, are placed. Work carried out without interrupting highway traffic.

The Fornaca, like its neighbors on the L’Aquila section, is among the first viaducts built on the A24-A25 network. In its more than 50 years of service, it has passed the test of recent earthquakes brilliantly, ensuring the arrival of timely relief to affected populations in 2009. Today the time has come to replace it with a new, safer structure of greater durability and strength.

The new viaduct will retain the layout and conformation of the old one but will be rebuilt with the most advanced engineering criteria, in line with the latest earthquake-resistant construction regulations.

The Web TV of Strada dei Parchi

Web TV

Lavori e Sicurezza

Infrarob, the “pothole capping rover” for infrastructure maintenance

Let’s learn about InfraROB, the experimental project that marks a breakthrough in innovation applied to infrastructure maintenance. InfraROB is a prototype autonomous robot developed as part of...

Recent news

SAFETY

Winter endowments from November 15: everything you need to know

With the gradual drop in temperatures and the imminent arrival of winter, the obligation to travel on roads equipped with winter tires or snow chains is triggered throughout Italy. These devices...

FLAVOURS ON THE GO

The Abruzzese chestnut: a journey through tradition and flavor

Autumn in Abruzzo is synonymous with warm colors, intense scents and authentic flavors. Among the undisputed protagonists of this season is the chestnut, a fruit that has accompanied peasant life for...