A24: the safety work in Tornimparte

Load tests on the first fully earthquake-proof viaduct. We are in Tornimparte, on the Sant’Onofrio viaduct of the A24 highway. Here with the demolition of the old viaducts, the transformation of the A24 was started so as to achieve the final Seismic Safety Mass.
Today after almost twenty months of work, we have arrived at the very delicate moment of load tests.
A true stress test of the work, which is used to check how the structure performs and how it withstands loads ten times greater than it will face every day.
The Web TV of Strada dei Parchi

Web TV

Lavori e Sicurezza

Snow Plan, SdP deploys new Supra 4002 turbo-tractor

It is called Supra 4002 and it is the new turbo tiller from Strada dei Parchi. This state-of-the-art machine, designed by Schmidt, is designed to efficiently remove large amounts of snow, combining...

Recent news

FLAVOURS ON THE GO

The Highway of Tastes: La Pupa e il Cavallo, the typical Easter sweets of Abruzzo

A recipe with ancient origins, which used to be prepared for the families of future brides and grooms on the occasion of the official engagement, over the years the Pupa e il Cavallo has become a...

EVENTS

Toto Holding welcomes Nave Vespucci to the port of Ortona

On Friday, April 4, Nave Vespucci will land in the port of Ortona and will be welcomed by Toto Holding, a partner for the Adriatic Abruzzo stop on the 2025 Mediterranean Tour of the “most...