FAI Spring Days between Rome and Abruzzo

Measure 4.2 – Along the route, the highway concessionaires, in relation to the highway sections they manage and in cooperation with each other, in addition to information related to the safety of travel, shall provide users, in the manner referred to in Measure 5, with adequate information

Strada dei Parchi will inform both users and all entities, which are affected in various ways, about any traffic restriction measures, both planned and ongoing, on the A24 and A25 highways, urging Travelers to plan their trips by avoiding the …

Measure 4.2 – Along the route, the highway concessionaires, in relation to the highway sections they manage and in cooperation with each other, in addition to information related to the safety of travel, shall provide users, in the manner referred to in Measure 5, with adequate information Read More »

Measure 4.6 – Right to travel-related information

In compliance with the rules on the protection of natural persons with regard to the processing of personal data, after the trip, the user has the right to obtain, where available – in the manner set forth in Measure 5.5 …

Measure 4.6 – Right to travel-related information Read More »

Measure 5.2 – The information channels

MEN AND TECHNOLOGY SERVING THE CUSTOMER Strada dei Parchi S.p.A.’s 24-hour Operations Room staff captures information for institutional purposes on the legal basis of legal provisions and commitments made with the Ministry of Infrastructure and Transport, through cameras installed along …

Measure 5.2 – The information channels Read More »

Measure 5.4 – Real-time traffic.

At www.stradadeiparchi.it/en/traffic/info-traffic/ you can see all traffic information in real time(disruptions to traffico/emergencies in place).

Measure 5.5 – The information referred to in Measure 4.6.

The travel-related information currently available on the receipt, issued upon request at the same time as transit, is: DATE AND TIME OF RELEASE ENTRY STATION EXIT STATION VEHICLE CLASS. OUTPUT TRACK PEDAGING METHODS OF PAYMENT In case of non-issuance of …

Measure 5.5 – The information referred to in Measure 4.6. Read More »