Ordinances

ORDINANCE NO. 33/2024E

The undersigned Eng. Davide Bergantin, Operations Director of the Concessionaire Strada dei Parchi S.p.A. (SdP)

WHEREAS

  • that in order to ensure adequate safety standards for traffic and the freeway infrastructure, ordinary maintenance work must necessarily be carried out on the channels of the S. Giacomo and Torrioni I and II present on the right margin of the west carriageway between progr. km 107+500 and progr. km 104+000 of the A24 Roma – Teramo freeway;
  • that, in connection with the assessments made to reconcile the operational needs of the construction sites with the fluidity of highway traffic, the competent Coordinator of the 2nd Highway Safety Center of the Operations Directorate pointed out the need, in order to ensure the safety of highway users and the personnel assigned to the execution of the work, to provide for the necessary partializations of the highway roadways;

VIEWED

  • Articles 5 – 6 paragraph 4 and 6 – 21 – 39 and 41 of the New Highway Code;
  • Articles 77 and 81 of the Regulations for Execution and Implementation of the New Highway Code;
  • Ministerial Decree 10/07/2002 “Technical Specification of Temporary Signaling Schemes”;
  • the Decree 22.01.2019 “Identification of the procedure for reviewing, supplementing and affixing road signs intended for work activities that take place in the presence of vehicular traffic“

ORDER

March 25 to 28, 2024 the implementation of the following measure:

  • Partialization of the overtaking lane of the westbound carriageway (left way) between progr. km 107+500 and progr. km 104+000 approx. of the A24 freeway (plat. 17 of DM 10.07.2002 – “closure of overtaking lane on two-lane carriageway”).

This Ordinance is made known to the public with the installation of the prescribed signs in accordance with the N.C.d.S. D.Lgs.n. 285 of 30/04/1992 and the Implementing Regulations set forth in D.P.R. 16/12/1992 n. 495 as amended and the Ministerial Decree of Infrastructure and Transport of July 10, 2002 as well as the relevant explanatory circulars on the subject.

The signaling devices adopted for the temporary signaling of the aforementioned deviations must be affixed and constantly maintained in efficiency by the Impresa Parchi Global Service SpA, which remains solely responsible, both in civil and criminal law, for any damage caused to third parties and property in dependence of defects or inefficiency of the signaling, relieving the Strada dei Parchi SpA Concessionaire from any claims or harassment, including judicial.

The Exercise Director

(Eng. Davide Bergantin)

Back to News
The Web TV of Strada dei Parchi

Recent news

HISTORY

The Fairytale Gems of the Aniene Valley

Anyone traveling along the A24 between Rome East and Carsoli can catch glimpses of them here and there on the ridges, hidden among olive groves, beech forests, or nestled among houses. Some appear...

EVENTS

Two Routes Along the A24 and A25 with the GEP 2026

From the capital’s grand landmarks to the archaeological treasures of the Fucino, from the sanctuaries of the Maiella to the legacies of international humanitarian history, the 2026 European...

ENVIRONMENT

The Sun Above the Toll Booth: The Photovoltaic System at the Roma Est Toll Plaza

Since late August, 466 solar panels have been generating energy atop the canopies at the Barriera Roma Est interchange along the A24 highway. Not a single square meter of additional land was used:...