Press Communication

A24: nighttime ramp closures at Teramo East interchange

In order to carry out periodic inspections at the Cartecchio tunnel, from 22:00 hours on September 29, 30 and October 1, 2025 to 06:00 hours on the following days, at the Teramo Est Interchange, the closure of both the access ramp to the city of Teramo, coming from the A24 freeway and the SS 80 Teramo – Mare, and the access ramp to the A24 freeway, coming from the AQ/A25/RM direction and the Teramo – Mare, coming from Giulianova, will be ordered.

In the circumstance, both for traffic coming from the Teramo – Mare and the A24 highway and directed towards the ordinary road system of the city of Teramo, and for traffic coming from Giulianova and directed towards the A24 highway and the Teramo – Mare, it will be possible to use the traffic circles present on Viale Europa to access both the city of Teramo and the A24 highway and the Teramo – Mare.

Back to News
The Web TV of Strada dei Parchi

Recent news

FLAVOURS ON THE GO

Agriculture and Flavors: A Journey Through Lazio and Abruzzo

A particularly hot summer is slowly letting up, and the colors lining the highways already herald the arrival of fall. Starting in mid-September, the villages along the A24 and A25 highways open...

INSIGHTS

Tunnels and Safety: An Inseparable Pair

From the rules to follow while traveling to the coordination of emergency response efforts: on the A24 and A25 highways, safety is built every day, including through periodic field drills. Highway...

SAFETY

Fire in a Tunnel: When Every Minute Counts

What happens behind the scenes when a fire breaks out inside a highway tunnel? In this video, we take a closer look at a complex emergency drill conducted in the Roviano Tunnel on the A24 highway,...