The controlled demolition of the westbound carriageway of the Valle dei Fiori Viaduct marked the start of structural and seismic retrofitting work on the A25. A few days later, the westbound carriageway of the Castellucci Viaduct was also demolished. These works are essential to make the viaducts safer, more modern, and more durable, and have been scheduled to minimize the impact on traffic as much as possible.
With the controlled demolition of the Rome-bound carriageway of the Castellucci Viaduct, the program to structurally upgrade and ensure seismic safety of the viaducts on the A25 highway is moving forward. The demolition of the Valle dei Fiori viaduct marked the start of this important project, which is part of the plan commissioned by the Special Commissioner for the Structural Upgrading and Seismic Retrofitting of the A24 and A25 highways.
The completion of these viaducts marks the beginning of a new phase in the broader program aimed at the gradual renovation of structures along the two highways, with the goal of bringing structures built over fifty years ago up to the latest technical and seismic safety standards. The first phase involves five pairs of viaducts, almost all of which are located in the Peligna Valley between the Bussi/Popoli and Cocullo interchanges, in addition to the Foce viaduct, near Aielli/Celano. The Commissioner’s overall program is divided into nine phases and covers 72 viaducts along the A24 and A25.
An execution method designed to minimize the impact on traffic
The demolition of the first two viaducts was carried out using micro-charges placed at carefully planned points on the deck, a technique that, where conditions permit, allows the demolition to be completed in a very short time and consequently reduces the duration of highway closures.
The operations were always carried out at night, with traffic disruptions limited to the time strictly necessary to carry out the demolition and subsequent safety checks. Early in the morning, traffic resumed on the opposite lane, which had been set up for two-way traffic. The same technique will be used on the other viaducts when site and weather conditions permit. In areas near populated centers or where specific operational or safety requirements apply, demolition will instead be carried out using mechanical equipment.
Safer, more modern, and more durable viaducts
The projects on the Castellucci and Valle dei Fiori viaducts are not mere maintenance efforts, but reconstructions aimed at bringing the viaducts up to the most advanced structural and seismic-resistance standards.
The new structures will be built using more modern materials and construction methods, such asCorten steel, which offer greater durability and long-term strength. The structures will also be equipped with seismic-resistant features, such as isolation systems and joints designed to better absorb structural stresses and movements.
These projects are essential to ensuring a longer service life for the infrastructure and, above all, to further improving safety, reliability, and travel comfort for those who use the A24 and A25 every day.
“strada dei parchi”’s Commitment During Construction Work
on
Carrying out projects of this complexity on a highway that remains open to traffic requires particularly careful planning. “strada dei parchi”’s Operations Department, in coordination with the contractor and the commissioner’s office, is committed to organizing all phases of the construction site with the goal of minimizing the impact on traffic and completing the work as quickly as possible, while always prioritizing the safety of workers and highway users.
As was already the case at the A24 construction sites between Tornimparte and L’Aquila Ovest, work is scheduled to ensure uninterrupted traffic flow by diverting traffic in both directions to the lane not affected by construction and by limiting closures—which are necessary for the most complex operations—to nighttime hours.
On the A24, this operational model has already facilitated the reconstruction and gradual reopening to traffic of numerous viaducts on the section between Tornimparte and L’Aquila Ovest.
A new page dedicated to “Extraordinary Work” has
been added
to the website
:
. To help users better understand why these projects are necessary, how they are carried out, and how the program is progressing, “strada dei parchi” has created a new section on its website dedicated to Extraordinary Work.
A space where visitors can learn more about the safety measures being implemented, discover the technologies used, track the progress of the construction sites, and view updates on the sections that have been progressively completed and reopened to traffic. The page’s layout also includes a map showing the status of the viaducts and information on the temporary traffic route changes required during construction.
A solution to support a complex construction program with consistent and transparent information, explaining to users what is changing on the highway and why today’s construction projects are necessary to make the infrastructure network—which is strategic for the people, communities, and economy of central Italy—safer and more durable over time.