Totem

Measure 3.1.c – Site management criteria adopted by the Concessionaire in accordance with Measure 8.2

Worksite planning represents an essential tool for the effective and efficient management of worksites for works on the freeway section. This aspect plays a fundamental role for Strada dei Parchi SpA in order to achieve the objectives set by the …

Measure 3.1.c – Site management criteria adopted by the Concessionaire in accordance with Measure 8.2 Read More »

Measure 3.e – Measures having the object of inhibition to certain types of traffic, with specification of the reason and estimated duration.

At the following link www.stradadeiparchi.it/en/traffic/ordinances/ on the company’s website, all Ordinances and restrictions issued by the Company can be viewed.<

3.f – The categories of events that could generate disruptions to highway traffic and/or dangerous situations, including accidents or the presence of foreign bodies in the roadway, with specification, for each type of event, of the average timescales for restoring regular and/or safe traffic conditions, calculated on the basis of monitoring carried out the previous year.

Main categories of events that led to highway traffic disruptions and/or dangerous situations based on the actual data as of December 31, 2025: Event Category Number of events 2025 Average resolution time in hours Construction sites for works 4.532 32:55 …

3.f – The categories of events that could generate disruptions to highway traffic and/or dangerous situations, including accidents or the presence of foreign bodies in the roadway, with specification, for each type of event, of the average timescales for restoring regular and/or safe traffic conditions, calculated on the basis of monitoring carried out the previous year. Read More »

Measure 3.g – summary description of the protocols, as well as operational procedures under Measure 6, adopted for emergency management, including the conditions under which, also in application of these operational procedures, a section closure is made.

Strada dei Parchi’s organization is strongly oriented towards risk prevention and the management of resulting emergencies; in fact, monitoring and intervention procedures and emergency plans based on protocols and operational agreements with relevant bodies (Prefectures, Police Forces, Fire Brigade and …

Measure 3.g – summary description of the protocols, as well as operational procedures under Measure 6, adopted for emergency management, including the conditions under which, also in application of these operational procedures, a section closure is made. Read More »

Measure 3.h – summary description of quality indicators identified by the grantor.

The service quality indicators, defined by the Grantor are as follows: the Ipav Pavement Structural Condition Indicator, which takes into account the Surface Roughness (Ia1) and Regularity (Ia2) of pavements as representative of the road’s superstructure, related to technical safety …

Measure 3.h – summary description of quality indicators identified by the grantor. Read More »